Boiler house
- CHP’s installed capacity is 146MW of thermal energy and 6 MW of electric energy. The plant consist of two steam coal boilers OR-32, two coal boilers WR-25, one coal boiler WRP-46 and a 6MW turbine. Such installation allows to produce 750,000 GJ of thermal energy and 19,000 MWh annually.
Efficiency
Plant modernization allowed increasing the production efficiency from 78 to 83% and sales efficiency from 75 to over 80%.
|
Even better results were achieved in electricity consumption which was reduced by over 35%. The CHP uses 42,000 tons of coal and 5,000 MWh of electricity annually.
|
|
|
 |